Disclosure: this page mentions companies we may in future earn a commission from. We are not yet part of any affiliate programme, so no link on this page currently earns money. Commission never changes the facts we publish. Full affiliate disclosure.
Do you need planning permission for solar panels? Houses, flats, listed buildings and plug-in solar (England)
Facts checked 22 November 2026 against the planning law itself (legislation.gov.uk), the government's explanatory memorandum, the Planning Portal and GOV.UK.
Most rooftop solar on houses in England doesn't need a planning application – it's "permitted development". But the rules changed on 27 August 2026, they're different for flats, and listed buildings are excluded altogether. Here's what the law actually says, in plain English.
Quick answer by property type
| Your situation | Permitted development? | Main limits (summary) |
|---|---|---|
| House, panels on a pitched roof | Usually yes | No more than 0.2m proud of the roof slope; not higher than the highest part of the roof (excluding chimneys) (GPDO Sch 2 Pt 14 Class A, A.1(2)(c)) |
| House, panels on a flat roof | Usually yes | Highest part no more than 0.6m above the highest part of the roof (excluding chimneys) (A.1(2)(d)). In a national park, AONB or conservation area ("article 2(3) land") you must first ask the council whether prior approval is needed (condition A.2(ba)) |
| House, panels on a wall, balcony or roof enclosure | Usually yes (since 27 Aug 2026) | Up to 0.4m proud – or 0.2m if that wall/balcony/enclosure abuts a highway (A.1(2)(a)–(b)). In a conservation area or World Heritage Site, not on a wall, balcony or roof enclosure that fronts a highway (A.1(2)(e)) |
| House in a conservation area | Often yes, with extra limits | Not on a wall/balcony/roof enclosure fronting a highway; flat-roof prior-approval step; lower limits for ground-mounted panels (see below) |
| Listed house (or any building in its curtilage) | No | Class A doesn't apply to a listed dwellinghouse or buildings within its curtilage (A.1(2)(g); memorandum para 5.9). You'd need to apply – GOV.UK also flags that listed building consent may be needed (GOV.UK (checked 22 Nov 2026)) |
| Block of flats | Sometimes | The older, tighter limits largely stay: 0.2m from the wall or pitched roof plane, not above the highest part of the roof, 0.6m on a flat roof; not on a wall fronting a highway in a conservation area or World Heritage Site; not at all on a listed block (A.1(1)). The 2026 relaxations were aimed at houses only (memorandum para 5.5) |
| Scheduled monument site | No | Excluded for houses and flats (A.1(1)(d), A.1(2)(f)) |
Source: Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 14, Class A, as amended 27 Aug 2026 (checked 22 Nov 2026). "Article 2(3) land" means National Parks, areas of outstanding natural beauty and conservation areas etc (GPDO article 2(3) (checked 22 Nov 2026)). This is a summary – the legal text has the full wording.
Conditions that apply even when it's permitted
- Panels must, so far as practicable, be sited to minimise their effect on the building's external appearance and on the amenity of the area (A.2(a)–(b)).
- They must be removed as soon as reasonably practicable when no longer needed (A.2(c)).
Source: GPDO Class A conditions (checked 22 Nov 2026).
What changed on 27 August 2026
The government amended the rules to make room for plug-in (balcony) solar and give householders more flexibility (explanatory memorandum to SI 2026/896 (checked 22 Nov 2026)). For houses:
- Panels on a wall, balcony or roof enclosure can now stick out up to 0.4m (0.2m if it abuts a highway); the 0.2m limit stays for pitched roofs (para 5.7).
- For ground-mounted ("stand-alone") solar: the one-array limit is removed, the 5m-from-boundary ban is removed (except in World Heritage Sites), and the 3m maximum dimension is removed – but new height limits apply near the boundary (paras 5.11–5.14).
For houses and flats: plug-in solar may not go on a wooden wall, balcony, fence, gate or enclosure, or on timber-clad parts of the building, because of fire-spread risk (paras 5.8, 5.16).
Ground-mounted (stand-alone) panels at a house
| Where it goes | Maximum height |
|---|---|
| Within 5m of the boundary and forward of the front (principal) elevation | 1m |
| Within 5m of the boundary | 2m |
| In a conservation area, nearer to a bounding highway than the house is | 2m |
| Any other case | 4m |
The lowest applicable limit wins. Total panel area can't exceed 9 square metres; not allowed in the curtilage of a listed building or on a scheduled monument; in a World Heritage Site not within 5m of the boundary or nearer the road than the house. If any part is in a conservation area and nearer a bounding road than the house, or on article 2(3) land within 5m of the boundary, you must ask the council whether prior approval is needed before starting (B.2(aa)).
Source: GPDO Sch 2 Pt 14 Class B, as amended 27 Aug 2026 (checked 22 Nov 2026). Blocks of flats keep stricter limits: one stand-alone array, 4m height, not within 5m of the boundary, max 9m² and 3m in any dimension (B.1(1)).
Plug-in (balcony) solar
DESNZ says plug-in solar became legal to buy and use across Great Britain from 27 August 2026; each kit produces up to 800W, which it says could save up to £110 a year. It also says that before buying you should check whether you need permission from a landlord, building owner or freeholder, planning permission or listed building consent (GOV.UK, 26 Aug 2026 (checked 22 Nov 2026)).
Plug-in kits are sold through retailers rather than fitted by installers, so this site's installer checks don't really apply – but the planning limits above (including the timber ban) do.
Flats and leasehold: planning isn't the only permission
If you own a flat, the roof and outside walls usually aren't yours alone. GOV.UK lists landlord, building owner or freeholder permission alongside planning permission (GOV.UK (checked 22 Nov 2026)). Get any freeholder consent in writing before you pay a deposit. An installer should ask about this at survey stage – if they don't, treat it as a warning sign.
Questions to ask your solar installer about planning
- Have you checked whether my property is listed, in a conservation area, a national park or an AONB? How?
- Will any panel stand more than 0.2m off the roof slope, or (on a flat roof) more than 0.6m above the roof?
- If a prior-approval application or planning application is needed, who prepares it, what does it cost, and is the quote conditional on approval?
- If I'm in a flat, have you seen the freeholder's written consent?
- Is the deposit refundable if permission is refused?
Then run our five-step installer check and compare typical solar costs.
Related guides
- Solar panel costs and payback
- Home battery storage
- Smart Export Guarantee tariffs compared
- Ground source heat pump costs and permits
Sources
- GPDO 2015 Sch 2 Pt 14 Class A – solar on domestic premises (legislation.gov.uk) (checked 22 Nov 2026)
- GPDO 2015 Sch 2 Pt 14 Class B – stand-alone solar (legislation.gov.uk) (checked 22 Nov 2026)
- Explanatory Memorandum to the GPDO (England) (Amendment) Order 2026, SI 2026/896 (PDF) (checked 22 Nov 2026)
- GPDO 2015 article 2 – interpretation, incl. article 2(3) land (checked 22 Nov 2026)
- Planning Portal – Solar panels: planning permission (checked 22 Nov 2026)
- GOV.UK – Households can save as plug-in solar panels come to market (26 Aug 2026) (checked 22 Nov 2026)
All sources checked 22 November 2026. Planning law changes – confirm with your local planning authority before installing.