UK Home Energy Installers

Disclosure: this page mentions companies we may in future earn a commission from. We are not yet part of any affiliate programme, so no link on this page currently earns money. Commission never changes the facts we publish. Full affiliate disclosure.

Do you need planning permission for solar panels? Houses, flats, listed buildings and plug-in solar (England)

Facts checked 22 November 2026 against the planning law itself (legislation.gov.uk), the government's explanatory memorandum, the Planning Portal and GOV.UK.

Most rooftop solar on houses in England doesn't need a planning application – it's "permitted development". But the rules changed on 27 August 2026, they're different for flats, and listed buildings are excluded altogether. Here's what the law actually says, in plain English.

England only. The permitted development rules on this page apply in England (explanatory memorandum, para 4.3 (checked 22 Nov 2026)). Wales, Scotland and Northern Ireland have their own rules – ask your council. Even in England, the Planning Portal says to check with your local planning authority that all the limits and conditions are met before you install (Planning Portal (checked 22 Nov 2026); find your local planning authority).

Quick answer by property type

Your situationPermitted development?Main limits (summary)
House, panels on a pitched roofUsually yesNo more than 0.2m proud of the roof slope; not higher than the highest part of the roof (excluding chimneys) (GPDO Sch 2 Pt 14 Class A, A.1(2)(c))
House, panels on a flat roofUsually yesHighest part no more than 0.6m above the highest part of the roof (excluding chimneys) (A.1(2)(d)). In a national park, AONB or conservation area ("article 2(3) land") you must first ask the council whether prior approval is needed (condition A.2(ba))
House, panels on a wall, balcony or roof enclosureUsually yes (since 27 Aug 2026)Up to 0.4m proud – or 0.2m if that wall/balcony/enclosure abuts a highway (A.1(2)(a)–(b)). In a conservation area or World Heritage Site, not on a wall, balcony or roof enclosure that fronts a highway (A.1(2)(e))
House in a conservation areaOften yes, with extra limitsNot on a wall/balcony/roof enclosure fronting a highway; flat-roof prior-approval step; lower limits for ground-mounted panels (see below)
Listed house (or any building in its curtilage)NoClass A doesn't apply to a listed dwellinghouse or buildings within its curtilage (A.1(2)(g); memorandum para 5.9). You'd need to apply – GOV.UK also flags that listed building consent may be needed (GOV.UK (checked 22 Nov 2026))
Block of flatsSometimesThe older, tighter limits largely stay: 0.2m from the wall or pitched roof plane, not above the highest part of the roof, 0.6m on a flat roof; not on a wall fronting a highway in a conservation area or World Heritage Site; not at all on a listed block (A.1(1)). The 2026 relaxations were aimed at houses only (memorandum para 5.5)
Scheduled monument siteNoExcluded for houses and flats (A.1(1)(d), A.1(2)(f))

Source: Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 14, Class A, as amended 27 Aug 2026 (checked 22 Nov 2026). "Article 2(3) land" means National Parks, areas of outstanding natural beauty and conservation areas etc (GPDO article 2(3) (checked 22 Nov 2026)). This is a summary – the legal text has the full wording.

Conditions that apply even when it's permitted

Source: GPDO Class A conditions (checked 22 Nov 2026).

What changed on 27 August 2026

The government amended the rules to make room for plug-in (balcony) solar and give householders more flexibility (explanatory memorandum to SI 2026/896 (checked 22 Nov 2026)). For houses:

For houses and flats: plug-in solar may not go on a wooden wall, balcony, fence, gate or enclosure, or on timber-clad parts of the building, because of fire-spread risk (paras 5.8, 5.16).

Ground-mounted (stand-alone) panels at a house

Where it goesMaximum height
Within 5m of the boundary and forward of the front (principal) elevation1m
Within 5m of the boundary2m
In a conservation area, nearer to a bounding highway than the house is2m
Any other case4m

The lowest applicable limit wins. Total panel area can't exceed 9 square metres; not allowed in the curtilage of a listed building or on a scheduled monument; in a World Heritage Site not within 5m of the boundary or nearer the road than the house. If any part is in a conservation area and nearer a bounding road than the house, or on article 2(3) land within 5m of the boundary, you must ask the council whether prior approval is needed before starting (B.2(aa)).

Source: GPDO Sch 2 Pt 14 Class B, as amended 27 Aug 2026 (checked 22 Nov 2026). Blocks of flats keep stricter limits: one stand-alone array, 4m height, not within 5m of the boundary, max 9m² and 3m in any dimension (B.1(1)).

Plug-in (balcony) solar

DESNZ says plug-in solar became legal to buy and use across Great Britain from 27 August 2026; each kit produces up to 800W, which it says could save up to £110 a year. It also says that before buying you should check whether you need permission from a landlord, building owner or freeholder, planning permission or listed building consent (GOV.UK, 26 Aug 2026 (checked 22 Nov 2026)).

Plug-in kits are sold through retailers rather than fitted by installers, so this site's installer checks don't really apply – but the planning limits above (including the timber ban) do.

Flats and leasehold: planning isn't the only permission

If you own a flat, the roof and outside walls usually aren't yours alone. GOV.UK lists landlord, building owner or freeholder permission alongside planning permission (GOV.UK (checked 22 Nov 2026)). Get any freeholder consent in writing before you pay a deposit. An installer should ask about this at survey stage – if they don't, treat it as a warning sign.

Questions to ask your solar installer about planning

Then run our five-step installer check and compare typical solar costs.

Related guides

Sources

  1. GPDO 2015 Sch 2 Pt 14 Class A – solar on domestic premises (legislation.gov.uk) (checked 22 Nov 2026)
  2. GPDO 2015 Sch 2 Pt 14 Class B – stand-alone solar (legislation.gov.uk) (checked 22 Nov 2026)
  3. Explanatory Memorandum to the GPDO (England) (Amendment) Order 2026, SI 2026/896 (PDF) (checked 22 Nov 2026)
  4. GPDO 2015 article 2 – interpretation, incl. article 2(3) land (checked 22 Nov 2026)
  5. Planning Portal – Solar panels: planning permission (checked 22 Nov 2026)
  6. GOV.UK – Households can save as plug-in solar panels come to market (26 Aug 2026) (checked 22 Nov 2026)

All sources checked 22 November 2026. Planning law changes – confirm with your local planning authority before installing.