A ground source heat pump takes heat from pipes buried in your garden or in a borehole. It usually costs more to install than an air source heat pump and needs the right land – plus, since October 2023, new systems in England have to meet Environment Agency conditions. Here's what the official sources say.
Key numbers
| Question | What the source says |
|---|---|
| Typical install cost | Around £15,000 with the ground loop in trenches; "considerably more" if you need a borehole (Energy Saving Trust (checked 22 Nov 2026)). For comparison, EST puts a typical air source install at ~£12,000 – see our air source cost guide. |
| Grant (England & Wales) | £7,500 under the Boiler Upgrade Scheme, including water source heat pumps and those on shared ground loops; plus £1,500 until March 2027 if the property is heated by oil or LPG and has no mains gas connection (GOV.UK (checked 22 Nov 2026)). Hybrid systems don't qualify. |
| Grant capacity limits | 45kWth for individual systems; 70kWth with additional heat pumps; 300kWth for shared ground loops (GOV.UK (checked 22 Nov 2026)) |
| VAT | 0% on installation in homes until 31 March 2027 – and the necessary groundworks are zero-rated too; 5% from 1 April 2027 (HMRC Notice 708/6, sections 2.1 and 2.14 (checked 22 Nov 2026)) |
| Scotland / Northern Ireland | Scotland: possible interest-free loan or grant. NI: no specific heat pump grant at the time EST's page was checked (EST (checked 22 Nov 2026)) |
| Efficiency | EST says heat pumps generate about three units of heat for every unit of electricity (EST (checked 22 Nov 2026)) |
EST's per-home savings figures for ground source are in an interactive chart our fetch couldn't read, so we don't quote a savings figure here.
What drives the price
EST lists the main cost factors as:
- ground access, and whether you choose trenches or a borehole;
- the brand, model and size of the heat pump;
- the size of the property and how much heat it needs;
- new build vs existing home;
- whether you upgrade radiators or fit radiators/underfloor heating for the first time.
Source: Energy Saving Trust – Ground source heat pumps (checked 22 Nov 2026).
Do you have the space? Trenches vs boreholes
| Horizontal ground loop (trenches) | Vertical borehole | |
|---|---|---|
| Space | Land near the home that can be dug, with machinery access from a road and no trees (roots cause problems). EST's example: a new-build 3-bed needs two trenches of 30–40m; older or larger homes need more | For limited space. About 20cm wide, but 75–200m deep; larger homes may need more than one |
| Cost | The ~£15,000 typical figure | Usually more expensive; usually needs a specialist ground (thermogeological) survey |
| Efficiency | – | Ground is generally warmer deeper down, so can be more efficient |
Indoors you'll need room for the heat pump unit, which often contains the hot water cylinder – roughly American-fridge size (about 120cm × 60cm × 60cm). Flats can share a large ground loop for the whole building, usually installed all at once with maintenance in the service charge; EST suggests air-to-air for small flats without outdoor space.
Source: EST (checked 22 Nov 2026). Shared ground loops are BUS-eligible (GOV.UK (checked 22 Nov 2026)).
Environment Agency rules (England)
Closed-loop systems (sealed pipes – the usual domestic type)
Systems installed on or after 2 October 2023 must either meet all the exemption conditions, meet the conditions in regulatory position statement RPS 307, or have a permit (Environment Agency (checked 22 Nov 2026)). Systems installed before that date don't need to, but must not cause pollution. If you meet all the exemption conditions you don't need to register. The conditions include:
- not in a groundwater source protection zone 1 (which includes anywhere within 50m of a private drinking/food-production water supply);
- not within 50m of a well, spring or borehole used for domestic or food-production supply;
- for a residential system of 45kW or less: not within 20m of a protected site (SSSI, SAC, SPA, Ramsar, local nature reserve) or ancient woodland;
- installation must not mobilise ground contamination (a desk study of previous land use is expected);
- not next to a septic tank or cesspit and its infiltration system;
- equipment must meet listed British Standards and Ground Source Heat Pump Association standards;
- it must be properly decommissioned (fluid removed, boreholes sealed) at end of life.
Source: GOV.UK – Closed loop systems: exemption conditions (checked 22 Nov 2026). The EA suggests the Magic map tool to check source protection zones and protected sites.
Open-loop systems (pumping groundwater)
You may need groundwater investigation consent before drilling, an abstraction licence if you take more than 20 cubic metres a day, and a discharge permit or registered exemption (GOV.UK – Open loop heat pump systems, updated 19 Nov 2026 (checked 22 Nov 2026)). Closed-loop systems don't need investigation consent or an abstraction licence.
Wales, Scotland and Northern Ireland have separate guidance (linked from the GOV.UK pages above).
Planning permission
EST says most heat pump installations are permitted development, with exceptions such as listed buildings and conservation areas – check with your local planning office (EST (checked 22 Nov 2026)).
Questions to ask a ground source installer
- Are you MCS certified for ground source heat pumps specifically? (Needed for the £7,500 grant.)
- Trenches or borehole – and why? Who does the drilling or digging, and is a ground survey included?
- Have you checked the Environment Agency exemption conditions for my site (source protection zones, nearby wells, septic tank, protected sites)? Will you give me that in writing?
- Is the quote shown at 0% VAT, including groundworks, and with the grant already deducted?
- What heat loss calculation is the system sized on, and do any radiators need upgrading?
- Who reinstates the garden after trenching, and is that priced?
Then run our five-step installer check before paying any deposit.
Related guides
- Smart tariffs for heat pumps
- Air source heat pump costs
- Boiler Upgrade Scheme guide
- Heat pump vs gas boiler
- Solar panels and planning permission
Sources
- Energy Saving Trust – Ground source heat pumps (checked 22 Nov 2026)
- GOV.UK – Boiler Upgrade Scheme: what you can get (checked 22 Nov 2026)
- HMRC – VAT Notice 708/6 (checked 22 Nov 2026)
- GOV.UK (Environment Agency) – Closed loop ground source systems: when you need a permit (checked 22 Nov 2026)
- GOV.UK (Environment Agency) – Closed loop systems: exemption conditions (checked 22 Nov 2026)
- GOV.UK (Environment Agency) – Open loop heat pump systems (checked 22 Nov 2026)
- MCS Find an Installer
All sources checked 22 November 2026.