Solar panel costs in the UK: what the official sources say

All figures below come from the linked sources, checked on 19 November 2026. They are averages – your quote will depend on your roof, system size and access.

Typical cost

The Energy Saving Trust (EST) says domestic solar panel systems are generally around 4.5 kWp and cost around £7,600 to install. A 4.5 kWp system typically covers 20–30 m² of roof and uses around 12 panels (Energy Saving Trust (checked 19 Nov 2026)).

EST lists what drives the price: system size, difficulty accessing your roof, panels vs tiles, integrating panels into the building, and whether the roof covering needs renewing.

Adding a battery

EST says battery storage tends to cost around £5,000 to £8,000 (Energy Saving Trust (checked 19 Nov 2026)).

VAT: 0% until 31 March 2027

HMRC's VAT Notice 708/6 says installations of certain energy-saving materials in residential accommodation are zero-rated from 1 May 2023 to 31 March 2027, and from 1 April 2027 revert to the reduced rate of 5% (HMRC VAT Notice 708/6 (checked 19 Nov 2026)).

The listed materials include solar panels (PV panels with cabling, control panel and inverter), air and ground source heat pumps and, from 1 February 2024, batteries for storing electricity (including retrofitted batteries and standalone batteries) – same source. Ask your installer to show the VAT treatment on the quote. More on batteries: home battery storage guide.

Payback: how long until it pays for itself?

EST's payback estimates (with export payments, based on fuel prices as of July 2026, England/Scotland/Wales):

LocationHome all dayHome half the dayOut all day
London9 years9 years9 years
Manchester10 years10 years11 years
Aberystwyth9 years9 years10 years
Stirling11 years11 years12 years

Source: Energy Saving Trust (checked 19 Nov 2026). EST notes Northern Ireland figures will be added in its next update.

Getting paid for exports: the Smart Export Guarantee (SEG)

The SEG launched on 1 January 2020 and requires some electricity suppliers (SEG Licensees) to pay small-scale generators for electricity exported to the grid. Suppliers set their own rate, contract length and terms, but the rate must always be above zero. Installations must be in Great Britain (Ofgem SEG (checked 19 Nov 2026)). Your SEG supplier doesn't have to be your electricity supplier (Ofgem SEG generators (checked 19 Nov 2026)).

EST says you'll typically get around 12p for each unit you export, and that you normally buy electricity for more than twice that, so using your own power can make more sense (Energy Saving Trust (checked 19 Nov 2026)). In Northern Ireland, EST suggests asking your supplier about export tariffs.

Compare SEG export rates from Octopus, British Gas, E.ON Next, EDF and OVO →

Grants and loans for solar

EST says there aren't any dedicated solar panel grants from the UK Government (Energy Saving Trust (checked 19 Nov 2026)). Separately, the government's Warm Homes Loan Scheme covers solar PV and battery storage for UK homeowners using an MCS-certified installer, with loans up to £15,000 for solar panels and up to £15,000 for a battery (GOV.UK eligibility (checked 19 Nov 2026); GOV.UK factsheet, published 27 Oct 2026 (checked 19 Nov 2026)). Lenders set their own rates and checks.

Permission and paperwork

Reading a solar quote: what should be itemised?

How to check the installer →

Find a checked local installer

In Swindon? See 14 MCS-certified solar installers based near Swindon, each checked on MCS, Companies House and RECC/HIES (23 Nov 2026), and the Swindon & Wiltshire local guide.

Sources

  1. Energy Saving Trust – Solar panels (checked 19 Nov 2026)
  2. HMRC – VAT Notice 708/6 Energy-saving materials and heating equipment (checked 19 Nov 2026)
  3. Ofgem – Smart Export Guarantee (checked 19 Nov 2026)
  4. Ofgem – SEG generators (checked 19 Nov 2026)
  5. GOV.UK – Warm Homes Loan Scheme eligibility (checked 19 Nov 2026)
  6. GOV.UK – Warm Homes Loan Scheme factsheet (checked 19 Nov 2026)
  7. RECC – Why you should use a RECC member (checked 19 Nov 2026)