Smart Export Guarantee (SEG) tariffs compared
Rates checked 21 November 2026 on each supplier's own SEG page. Export rates change often – always confirm on the supplier's site before you apply.
How much the big suppliers pay for the solar electricity you send back to the grid, which rates need you to buy your electricity (or your panels) from them, and what you need before you can apply.
How the SEG works (in 60 seconds)
- The SEG launched on 1 January 2020. It requires some electricity suppliers (SEG Licensees) to pay small-scale generators for low-carbon electricity they export (Ofgem (checked 21 Nov 2026)).
- Eligible technologies are solar PV, wind, micro-CHP, hydro and anaerobic digestion, up to 5MW (50kW for micro-CHP), and the installation must be in Great Britain (Ofgem (checked 21 Nov 2026)).
- Each licensee sets its own rate, contract length and terms, but the rate must always be above zero. Payments are based on export meter readings (Ofgem (checked 21 Nov 2026)).
- Your SEG supplier doesn't have to be your electricity supplier. Ofgem advises generators to shop around (Ofgem – SEG generators (checked 21 Nov 2026)). But, as the table shows, the best rates are usually only for the supplier's own customers.
- EST says you'll typically get around 12p per exported unit, while you normally pay more than twice that for electricity you buy, so using your own power first can make more sense (Energy Saving Trust (checked 21 Nov 2026)).
SEG rates from six suppliers
Only what each supplier publishes on the page linked. “Tied” means you must also buy your electricity from that supplier, or have bought your system from it.
| Supplier & tariff | Rate | Fixed or variable | Main conditions (as published) |
|---|---|---|---|
| Octopus – Outgoing Octopus | 12p/kWh | Variable | You must be an Octopus Energy customer; only pairs with certain import tariffs; needs a smart meter sending half-hourly export data (Octopus (checked 21 Nov 2026)) |
| Octopus – Prime Outgoing Octopus | 16p/kWh 4pm–7pm; 9p/kWh rest of day | 12-month fixed term, locked-in rate formula, no exit fees | Octopus customer; aimed at solar + battery homes that can shift export to the evening (Octopus (checked 21 Nov 2026)) |
| Octopus – Agile Outgoing Octopus | Half-hourly, follows day-ahead wholesale prices (uncapped) | 12-month fixed term, locked-in rate formula, no exit fees | Octopus customer; aimed at homes with storage (Octopus (checked 21 Nov 2026)) |
| British Gas – Export Premium | 12p/kWh | Variable; free to switch or cancel | British Gas electricity customers, systems up to 15kW. Rates “updated 27th August 2026” (British Gas (checked 21 Nov 2026)) |
| British Gas – Export Extra | 8p/kWh | Variable | British Gas electricity customers, systems over 15kW (British Gas (checked 21 Nov 2026)) |
| British Gas – Export SEG (untied) | 3p/kWh | Not stated on page | Anyone not a British Gas electricity customer, and developers (British Gas (checked 21 Nov 2026)) |
| E.ON Next – Next Export Premium v3 | 17.5p/kWh | 12-month fixed, no exit fees, no renewals | Solar and/or battery installed by E.ON Installation Services from 10 Nov 2025; residential, up to 15kW (E.ON Next (checked 21 Nov 2026)) |
| E.ON Next – Next Export Exclusive v3 | 13p/kWh | 12-month fixed, no exit fees | E.ON Next import tariff (excluding time-of-use tariffs such as Next Drive); residential, up to 15kW (E.ON Next (checked 21 Nov 2026)) |
| E.ON Next – Next Flex Export v1 | 6p/kWh | Variable, no exit fees | Systems up to 5MW; “new and existing customers” (E.ON Next (checked 21 Nov 2026)) |
| EDF – Export Exclusive 12m V3 | 18p/kWh | No exit fees | Buy solar, a battery or both from EDF; solar PV only (EDF (checked 21 Nov 2026)) |
| EDF – Export 12m V2 | 13p/kWh | 1-year fixed, no exit fees | EDF's sign-up steps on the same page say to buy solar or a battery from EDF – check the tariff's eligibility terms (EDF (checked 21 Nov 2026)) |
| EDF – SEG Export Variable Value | 5.6p/kWh | Variable | EDF electricity customers only (EDF (checked 21 Nov 2026)) |
| EDF – SEG Export Variable (untied) | 2.0p/kWh (from 28 Oct 2026; was 3.0p) | Variable, no exit fees | Available to anyone, whatever your supplier (EDF (checked 21 Nov 2026)) |
| OVO – SEG (untied) | 4p/kWh | Not stated on page | Electricity supply with any provider; up to 5MW (50kW micro-CHP) (OVO (checked 21 Nov 2026)) |
| OVO – SEG Beyond Exclusive | 12p/kWh | Not stated on page | Electricity supply with OVO; installed capacity under 30kW (OVO (checked 21 Nov 2026)) |
| OVO – SEG Install Exclusive | Up to 20p/kWh (15p if OVO installs solar panels only) | Not stated on page | OVO supplies your electricity and installed your solar panels and battery; under 30kW (OVO (checked 21 Nov 2026)) |
Six suppliers are shown because their rates were published on pages we could read. Other SEG Licensees exist – Ofgem publishes a list of current licensees once a year (Ofgem (checked 21 Nov 2026)).
What the table tells you
- Untied rates are low. If you keep your current supplier and export elsewhere, the published untied rates here range from 2.0p (EDF) to 6p (E.ON Next Flex Export, if open to you).
- The highest rates are installer-tied. EDF 18p, E.ON Next 17.5p and OVO up to 20p all need you to have bought your system from that company. Compare the whole package price, not just the export rate.
- Check the import tariff too. A tied export rate is only worth having if the import tariff you must take is also competitive. Octopus says Outgoing Octopus only pairs with certain import tariffs, and E.ON Next excludes time-of-use import tariffs such as Next Drive.
- Batteries change the maths. Time-banded or wholesale-linked exports (Octopus Prime/Agile) are aimed at homes that can store power and export at peak times. See our battery storage guide.
What you need before you apply
- An eligible system with an MCS certificate (or equivalent such as Flexi-Orb) and proof of grid connection (G98/G99) from your Distribution Network Operator (British Gas (checked 21 Nov 2026); OVO (checked 21 Nov 2026)).
- A smart meter that records export every half-hour (British Gas (checked 21 Nov 2026); Octopus (checked 21 Nov 2026)).
- If export has never been set up at the address, a new export MPAN from your DNO. Octopus says this step takes 1–4 weeks; British Gas and OVO say set-up can take up to about 4 weeks (Octopus (checked 21 Nov 2026); British Gas (checked 21 Nov 2026); OVO (checked 21 Nov 2026)).
- If you get Feed-in Tariff export payments, you can't get SEG for the same installation at the same time. EDF says you can opt out of FiT export and move to SEG, but can't opt back in for 12 months (EDF (checked 21 Nov 2026)). Octopus says you can't switch to Outgoing Octopus if you started receiving FiT payments in the last 12 months (Octopus (checked 21 Nov 2026)).
Related guides
- Solar panel costs and payback
- Battery storage costs
- Compare national installers
- FAQ: will I get paid for exports?
Sources
- Ofgem – Smart Export Guarantee (checked 21 Nov 2026)
- Ofgem – SEG generators (checked 21 Nov 2026)
- Energy Saving Trust – Solar panels (checked 21 Nov 2026)
- Octopus Energy – Outgoing Octopus (checked 21 Nov 2026)
- British Gas – Smart Export Guarantee tariff (checked 21 Nov 2026)
- E.ON Next – Smart Export Guarantee (checked 21 Nov 2026)
- EDF – Smart Export Guarantee tariffs (checked 21 Nov 2026)
- OVO – Smart Export Guarantee (checked 21 Nov 2026)