Disclosure: this page mentions companies we may in future earn a commission from. We are not yet part of any affiliate programme, so no link on this page currently earns money. Commission never changes the facts we publish. Full affiliate disclosure.
Home EV charger installation: grants, rules and what to check
Facts checked 20 November 2026 against GOV.UK. Grants close 31 March 2027.
What the government grant covers (and who it leaves out), the smart-charging rules every home charger sold in Great Britain must meet, and the questions to put to an installer before you pay.
Is there a grant? Check which group you're in
| Your situation | Grant | Key conditions |
|---|---|---|
| You own and live in a flat, or rent any home | Up to £500 (one socket) | Private, clearly defined off-street parking you own or have a legal right to; an OZEV-approved vehicle you own, lease (6+ months), use for work (6+ months) or have on order; landlord/freeholder written permission |
| You own or rent a home with only on-street parking | Up to £500 | You must be installing a cross-pavement solution, such as a charging gully |
| You own and live in a house with a driveway | No home grant | Owner-occupied houses are excluded from the flats-and-renters grant (unless the house is converted into flats and you live in one) |
| Landlords | Up to £500 per socket | Up to 200 sockets across all sites |
Sources: GOV.UK chargepoint grants; GOV.UK eligibility; GOV.UK changes from 1 April 2026 (checked 20 Nov 2026). The home grant rose from £350 to £500 per socket on 1 April 2026, and these grants have been extended "for a final year" to 31 March 2027.
You also can't claim if…
- you're a lodger in a home where the landlord or owner lives;
- you're moving house or planning to move;
- you've already claimed this grant or its predecessors (EVHS or the Domestic Recharge Scheme);
- the law already requires the property to have a chargepoint (for example, a new build).
Source: GOV.UK eligibility (checked 20 Nov 2026).
How the flats-and-renters grant works, step by step
- Check your vehicle is on OZEV's approved list and the charger model is on the eligible chargepoint list.
- Get a dated quote from an OZEV-authorised installer.
- Collect your documents: the quote, written permission from your landlord, freeholder or property manager, local authority permission if the building is listed, a utility bill in your name at the address, and your tenancy agreement if you rent.
- Apply online (the scheme moved to a new application platform on 1 April 2026).
- Do not have the charger fitted until OZEV tells you that you're eligible. GOV.UK estimates up to 10 working days to assess applications.
- After fitting, the installer claims the grant and it is paid directly to them. OZEV may audit the installation, including a site visit.
Sources: GOV.UK how to apply; GOV.UK changes from 1 April 2026 (checked 20 Nov 2026).
The smart charging rules every home charger must meet
Since 30 June 2022, chargers sold for home or workplace use in Great Britain must meet the Electric Vehicles (Smart Charge Points) Regulations 2021. A compliant charger must, among other things:
- have smart functions and keep them if you switch electricity supplier;
- keep charging if it loses its internet connection;
- measure the electricity used and the charging time, and show you that information;
- come with pre-set off-peak default charging hours that you can accept, remove or change, and a randomised delay function;
- meet the security requirements (in force from 30 December 2022).
The rules don't cover chargers sold in Northern Ireland or second-hand sales between private individuals.
Source: GOV.UK smart charge point regulations (checked 20 Nov 2026). Enforced by the Office for Product Safety and Standards.
Questions to ask before you pay
These are questions to ask, not rules. Get the answers in writing.
- Are you OZEV-authorised? What is your OZEV number? (You'll need it if you contact the grant team.)
- Is the quoted charger on the eligible chargepoint list, and is it sold as compliant with the smart charge point regulations?
- What exactly is included: cable run length, wall or post mount, any upgrade to the main fuse or consumer unit, and making good afterwards? What would cost extra?
- Will your own staff fit it, or a subcontractor?
- What warranty comes with the charger, and separately with the installation work?
- For flats: who has to give written permission (freeholder, managing agent), and have you done installs in shared car parks before?
Our five-step installer check (Companies House history, deposits, who installs) applies to EV charger firms too. Note that the MCS register covers technologies like solar, batteries and heat pumps; for a grant-funded charger the key credential is OZEV authorisation.
Cheaper charging: EV tariffs
Most of the savings from a home charger come from an overnight EV tariff (around 6–7p/kWh on several suppliers' pages, checked 23 Nov 2026). See EV and heat pump smart tariffs compared.
National firms that sell EV chargers
Boxt and Heatable both list EV chargers among their products. See what each publishes on prices, warranties and who installs. We haven't checked whether either is OZEV-authorised – ask them.
Sources
- Electric vehicle chargepoint grants – GOV.UK (OZEV), updated 1 April 2026
- Changes to EV chargepoint grant schemes from 1 April 2026 – GOV.UK, updated 7 July 2026
- Chargepoint grant for renters or flat owners: eligibility – GOV.UK
- Chargepoint grant for renters or flat owners: apply – GOV.UK
- Regulations: electric vehicle smart charge points – GOV.UK (OPSS)
All sources checked 20 November 2026.